Bumper to bumper traffic with Gary Rd. construction - WLOX.com - The News for South Mississippi

Bumper to bumper traffic with Gary Rd. construction

Posted: Updated:
BYRAM, MS (Mississippi News Now) -

Back-to-school drivers in Byram faced some serious bumper to bumper traffic Wednesday morning.

Traffic was backed up for several blocks on Gary Road because of ongoing construction.

While the roadwork is taking place the intersection of Gary Road and Davis Road is the only open intersection for drivers to get to Gary Road Elementary and Intermediate Schools.

Students made it to class, but several were late because of the traffic delays.

"This mornings traffic was hectic it took about 45 minutes for me to get here when normally it takes about 10 minutes," said Adarianne Brumfield, a Byram parent.

Gary Road delays could last for another two months.

Copyright 2013 MSNewsNow. All rights reserved.

Powered by WorldNow

208 DeBuys Road
Biloxi, MS 39531
(228) 896-1313

FCC Public File
EEO Report
Closed Captioning

All content © Copyright 2000 - 2014 Worldnow and WLOX. All Rights Reserved.
For more information on this site, please read our Privacy Policy and Terms of Service.